2023-08-31
The objective of the project is to relieve the current incidence of flooding and high groundwater at Mesaieed Industrial City by installing a groundwater drainage network and pumping stations.
Al-Balagh’s scope covers detailed design and engineering, procurement, installation, construction, pre-commissioning, commissioning, performance testing, and start-up of the FACILITY (Phase 2)